ABOUT US
Main achievement
Contract No. | Project name | Construction area(m2) | Cost (ten thousand yuan) | Project Overview | Quality meets standards |
SDXZ-04-15 | Electrical and Mechanical Installation Project of Shandong Xuanzhu Scientific Research Building Project | 24502 | 1630 | Xuanzhu scientific research building process equipment and pipeline installation, water supply and drainage, electrical, automatic control, HVAC, clean decoration engineering construction. | Qualified |
HKJZ-10-30 | Electrical and Mechanical Equipment Installation Project of Dalian Hongkai Chemical Technology Development Co., Ltd. with an annual output of 200 tons of chiral drug intermediates industrialization project | 8520 | 2128 | Procurement, production and installation of process piping for electromechanical equipment installation; procurement, production and installation of public and auxiliary pipelines; equipment installation; procurement and installation of electrical engineering; procurement and installation of instrumentation engineering and subsequent project implementation and management related to it , Completion, acceptance and repair of any defects. | Qualified |
2018-FB-Three points-0023 | Subcontract for the reconstruction and construction project of Beijing UE Factory | 3200 | 500 | Factory strong and weak electricity, clean decoration and air conditioning, construction, structure, fire protection, water supply and drainage systems. | Qualified |
2018-FB-Three points-0066 | Fifty-eight Institute No. 401 Building Third Floor Plastic Sealing Line Craft Factory Fitting Project | 2242 | 683 | 8 building 401 power room air conditioning room and pure wastewater, part of the roof exhaust system, 401 three-story reserved area decoration, clean decoration, electrical and mechanical renovation projects, including: process cooling water, bulk gas, pure Waste water, water supply and drainage, HVAC, exhaust, smoke exhaust, electrical, fire protection, weak current, automatic control, access control, monitoring, etc. | Qualified |
2018-FB-Three points-0102 | The second decoration project of the plastic sealing line process workshop on the third floor of Building No. 401 of No. 58 Institute | 2242 | 51.7 | Process drainage secondary distribution, nitrogen system GN secondary distribution, process drainage secondary distribution, compressed air CDA secondary distribution, electrical power distribution secondary distribution, ventilation pipe secondary distribution. | Qualified |
CQTF-6-005 | The first-phase process equipment pipeline purchase and installation package installation project of the National Storage Base Project | 2450 | 220 | Process equipment pipeline secondary distribution engineering Gas system, that is, secondary configuration construction of process vacuum pipeline and gas system. | Qualified |
380--2018HEEI-22--CG-003 | General Contracting (EPC) Project of Baiyinhua Jinshan Power Generation Co., Ltd. Extraction Steam Heating Renovation Project | 13600 | 956.5 | 2×The 600KW pure condensing unit is transformed into a heating unit, and the heating load of a single unit is 110.46MW after the transformation. | Qualified |
2018-FB-Three points-0058 | Purchasing and installation of clean room of Shanghai Hehui Optoelectronics' 6th generation AMLED display project array factory | 5400 | 119 | Main system air conditioning water pipe installation. | Qualified |
CCG-DQAZGC-19-041 | Special molecular sieve and environmentally friendly catalytic new material research and development and industrialization project installation project of China Catalyst New Materials Co., Ltd. | 4500 | 500 | Installation content of air nitrogen station, fire fighting and circulating water pump room, boiler room, soft water station, outdoor equipment area, power supply and electrical equipment, ground and underground pipe network (including docking), etc. and the installation content specified by the contractor on site | Qualified |
DQJA190701 | Electromechanical installation project of Songmudao Branch of Dalian Baiao Chemical Co., Ltd. | 4000 | 130 | Complete the installation engineering construction of the project according to the requirements of the construction drawings, including but not limited to: BIT workshop, CIT workshop, incinerator workshop, nitrogen supply workshop, air compressor workshop, circulating water workshop in the plant, etc. The installation content and the site designated by the contractor Installation content | Qualified |
404-2019HEEI-06-CG-005 | China Guodian Group Guodian Kangping Power Generation Co., Ltd. Load Flexible Heating and Extraction Steam Retrofit Project Infrastructure Construction | 12050 | 204.6 | 2*600M WModification of heat supply extraction steam for load flexibility of heating unit | Qualified |
ATGN-DQ-001 | Dalian Aote Cobalt and Nickel New Material Manufacturing Co., Ltd. Lithium Battery Additives and Petroleum Catalyst Electrical Automation Engineering | 19900 | 360 | Lithium battery additives and petroleum catalyst projects-process pipelines, equipment, automatic control, plant street lights and plant power and electrical engineering | Qualified |
SY201914004 | Replacement project of air conditioning purification system in preparation room of Dalian Dermatology Hospital | 3500 | 35 | The purification air conditioning system of the general preparation workshop on the second floor of the preparation room was replaced, the purification system of the microorganism room was replaced, and the liquid tank partition on the first floor was removed, and it was transformed into a replacement door for the water production room of the decoction room to treat the ground. Installation of air-conditioning units, exhaust boxes, high-efficiency filters, surface coolers and other equipment. | Qualified |
GF-2013-0201 | 102 Workshop 7 of Dalian Double Boron Pharmaceutical Chemical Co., Ltd. Production and installation of a clean room |
4800 | 39 | 02 Fabrication and installation of 7 clean rooms in the workshop, including: 2 packaging rooms on the 1st floor, 2 drying rooms on the 2nd floor, 1 material room, 2 centrifugal rooms on the 3rd floor, including walls, ceilings, doors, Window production and installation, labor and materials | Qualified |
GF-2017-0201 | Installation project of 1# workshop (6~12 axis) of Dalian Shuangbo Pharmaceutical Chemical Co., Ltd. | 4800 | 697.6 | Project content: 1# workshop (6~12 axis) equipment installation, 1# workshop (6~12 axis) pipeline installation, 1# steel structure production and installation, 1# workshop (6~12 axis) electrical instrument installation, 1# Workshop (6~12 axis) air conditioning and ventilation System installation, 1# workshop (6~12 axis) debugging, test run guarantee, anti-corrosion and thermal insulation outer armor project involving the above range, thermal insulation and cold insulation outer armor project for 12 storage tanks and 1 condenser in the tank farm, etc. (see bidding for details The engineering quantity list provided by the party and the technical requirements and descriptions of the bidding documents and appendix drawings) |
Qualified |
HQK20200805 | Reconstruction project of preparation room of Dalian Dermatology Hospital | 3500 | 8.66 | Renovation of the ground in the clean area on the second floor; installation of clean transfer windows for the finished product export of the preparation workshop on the second floor; temporary storage of internal packaging materials in the clean area on the second floor; renovation of the liquid distribution room and emulsification room on the second floor; renovation of the third floor air-conditioning room; second floor drug inspection room and Renovation of the physical and chemical laboratory on the third floor; other sporadic projects. Installation of fans, clean transfer windows and other equipment |
Qualified |