Contract No. Project name Construction area(m2) Cost (ten thousand yuan) Project Overview Quality meets standards
SDXZ-04-15 Electrical and Mechanical Installation Project of Shandong Xuanzhu Scientific Research Building Project 24502 1630 Xuanzhu scientific research building process equipment and pipeline installation, water supply and drainage, electrical, automatic control, HVAC, clean decoration engineering construction. Qualified
HKJZ-10-30 Electrical and Mechanical Equipment Installation Project of Dalian Hongkai Chemical Technology Development Co., Ltd. with an annual output of 200 tons of chiral drug intermediates industrialization project 8520 2128 Procurement, production and installation of process piping for electromechanical equipment installation; procurement, production and installation of public and auxiliary pipelines; equipment installation; procurement and installation of electrical engineering; procurement and installation of instrumentation engineering and subsequent project implementation and management related to it , Completion, acceptance and repair of any defects. Qualified
2018-FB-Three points-0023 Subcontract for the reconstruction and construction project of Beijing UE Factory 3200 500 Factory strong and weak electricity, clean decoration and air conditioning, construction, structure, fire protection, water supply and drainage systems. Qualified
2018-FB-Three points-0066 Fifty-eight Institute No. 401 Building Third Floor Plastic Sealing Line Craft Factory Fitting Project 2242 683 8 building 401 power room air conditioning room and pure wastewater, part of the roof exhaust system, 401 three-story reserved area decoration, clean decoration, electrical and mechanical renovation projects, including: process cooling water, bulk gas, pure Waste water, water supply and drainage, HVAC, exhaust, smoke exhaust, electrical, fire protection, weak current, automatic control, access control, monitoring, etc. Qualified
2018-FB-Three points-0102 The second decoration project of the plastic sealing line process workshop on the third floor of Building No. 401 of No. 58 Institute 2242 51.7 Process drainage secondary distribution, nitrogen system GN secondary distribution, process drainage secondary distribution, compressed air CDA secondary distribution, electrical power distribution secondary distribution, ventilation pipe secondary distribution. Qualified
CQTF-6-005 The first-phase process equipment pipeline purchase and installation package installation project of the National Storage Base Project 2450 220 Process equipment pipeline secondary distribution engineering Gas system, that is, secondary configuration construction of process vacuum pipeline and gas system. Qualified
380--2018HEEI-22--CG-003 General Contracting (EPC) Project of Baiyinhua Jinshan Power Generation Co., Ltd. Extraction Steam Heating Renovation Project 13600 956.5 2×The 600KW pure condensing unit is transformed into a heating unit, and the heating load of a single unit is 110.46MW after the transformation. Qualified
2018-FB-Three points-0058 Purchasing and installation of clean room of Shanghai Hehui Optoelectronics' 6th generation AMLED display project array factory 5400 119 Main system air conditioning water pipe installation. Qualified
CCG-DQAZGC-19-041 Special molecular sieve and environmentally friendly catalytic new material research and development and industrialization project installation project of China Catalyst New Materials Co., Ltd. 4500 500 Installation content of air nitrogen station, fire fighting and circulating water pump room, boiler room, soft water station, outdoor equipment area, power supply and electrical equipment, ground and underground pipe network (including docking), etc. and the installation content specified by the contractor on site Qualified
DQJA190701 Electromechanical installation project of Songmudao Branch of Dalian Baiao Chemical Co., Ltd. 4000 130 Complete the installation engineering construction of the project according to the requirements of the construction drawings, including but not limited to: BIT workshop, CIT workshop, incinerator workshop, nitrogen supply workshop, air compressor workshop, circulating water workshop in the plant, etc. The installation content and the site designated by the contractor Installation content Qualified
404-2019HEEI-06-CG-005 China Guodian Group Guodian Kangping Power Generation Co., Ltd. Load Flexible Heating and Extraction Steam Retrofit Project Infrastructure Construction 12050 204.6 2*600M WModification of heat supply extraction steam for load flexibility of heating unit Qualified
ATGN-DQ-001 Dalian Aote Cobalt and Nickel New Material Manufacturing Co., Ltd. Lithium Battery Additives and Petroleum Catalyst Electrical Automation Engineering 19900 360 Lithium battery additives and petroleum catalyst projects-process pipelines, equipment, automatic control, plant street lights and plant power and electrical engineering Qualified
SY201914004 Replacement project of air conditioning purification system in preparation room of Dalian Dermatology Hospital 3500 35 The purification air conditioning system of the general preparation workshop on the second floor of the preparation room was replaced, the purification system of the microorganism room was replaced, and the liquid tank partition on the first floor was removed, and it was transformed into a replacement door for the water production room of the decoction room to treat the ground. Installation of air-conditioning units, exhaust boxes, high-efficiency filters, surface coolers and other equipment. Qualified
GF-2013-0201 102 Workshop 7 of Dalian Double Boron Pharmaceutical Chemical Co., Ltd.
Production and installation of a clean room
4800 39 02 Fabrication and installation of 7 clean rooms in the workshop, including: 2 packaging rooms on the 1st floor, 2 drying rooms on the 2nd floor, 1 material room, 2 centrifugal rooms on the 3rd floor, including walls, ceilings, doors, Window production and installation, labor and materials Qualified
GF-2017-0201 Installation project of 1# workshop (6~12 axis) of Dalian Shuangbo Pharmaceutical Chemical Co., Ltd. 4800 697.6 Project content: 1# workshop (6~12 axis) equipment installation, 1# workshop (6~12 axis) pipeline installation, 1# steel structure production and installation, 1# workshop (6~12 axis) electrical instrument installation, 1# Workshop (6~12 axis) air conditioning and ventilation

System installation, 1# workshop (6~12 axis) debugging, test run guarantee, anti-corrosion and thermal insulation outer armor project involving the above range, thermal insulation and cold insulation outer armor project for 12 storage tanks and 1 condenser in the tank farm, etc. (see bidding for details The engineering quantity list provided by the party and the technical requirements and descriptions of the bidding documents and appendix drawings)
Qualified
HQK20200805 Reconstruction project of preparation room of Dalian Dermatology Hospital 3500 8.66 Renovation of the ground in the clean area on the second floor; installation of clean transfer windows for the finished product export of the preparation workshop on the second floor; temporary storage of internal packaging materials in the clean area on the second floor; renovation of the liquid distribution room and emulsification room on the second floor; renovation of the third floor air-conditioning room; second floor drug inspection room and Renovation of the physical and chemical laboratory on the third floor; other sporadic projects.

Installation of fans, clean transfer windows and other equipment